Originally Posted by phlajb
What are those yellow/orange plastic looking things used for concrete? Is this new technology in construction
http://phillyskyline.com/bldgs/comcast/comcast_0512.htm
First time I saw them was at the Jeff garage at 10&Chestnut last year.
They're part of the forms.
__________________
fotographia


Reply With Quote
  #22 (permalink)  
Old 02-27-2006, 04:58 PM
buildhigh buildhigh is offline
Tastykake Maker
 
Join Date: Dec 2005
Location: Art Museum
Posts: 214
Default

Quote:
Originally Posted by phlajb
What are those yellow/orange plastic looking things used for concrete? Is this new technology in construction
http://phillyskyline.com/bldgs/comcast/comcast_0512.htm
First time I saw them was at the Jeff garage at 10&Chestnut last year.
They are called vertical slip forms. They fill the void area within forms with rebar & concrete. When the concrete is set they use hydaulics to jack up the whole section to start the next level.
Reply With Quote
  #23 (permalink)  
Old 02-27-2006, 05:01 PM
wysong's Avatar
wysong wysong is offline
Cheesesteak GURU! Wiz with
 
Join Date: Aug 2004
Posts: 1,689
Default

Quote:
Originally Posted by phlajb
If you say it's 1floor/week, then CmcstCtr should be topped out by end of December 2006. Looking at the website from pictures exactly 1 yr ago doesn't seem right. It took that long to reach floor 7?
I also think a lot of time/work went into reinforcing the commuter tunnel so it can bear the weight of the building and so it doesn't have to be done again for a real long time. makes sense to do it before you lay the foundation, not after.
Reply With Quote

Advertisement

   
     
  #24 (permalink)  
Old 02-28-2006, 07:37 PM
KEIKO's Avatar
KEIKO KEIKO is offline
Water Ice Vendor
 
Join Date: Jun 2005
Location: philly
Posts: 996
Default

Quote:
Originally Posted by giovanni sasso
for what it's worth, i've been documenting comcast center's construction since it was the public defenders building. pictures are listed by month chronologically (in reverse from newest to oldest) here: http://phillyskyline.com/bldgs/comcast/i2.htm
hey thats fantastic!!!

whats the deal with that small triangle finished looking structure that went up first near the corner?
__________________
NO MATTER WHERE YOU GO...THERE YOU ARE
Reply With Quote
  #25 (permalink)  
Old 03-01-2006, 11:01 AM
buildhigh buildhigh is offline
Tastykake Maker
 
Join Date: Dec 2005
Location: Art Museum
Posts: 214
Default

Quote:
Originally Posted by KEIKO
hey thats fantastic!!!

whats the deal with that small triangle finished looking structure that went up first near the corner?
That's what the exterior of the building is going to look like when finished. I'm pretty sure they use it as a showroom for potential tenants.
Reply With Quote
  #26 (permalink)  
Old 03-01-2006, 11:52 AM
gap27's Avatar
gap27 gap27 is offline
Resident Optimist
 
Join Date: Mar 2004
Location: Powelton Village
Posts: 1,120
Default

I believe (I could be wrong)...that mock ups like this one are for testing purposes. You'll see them at most high rise construction sites. For instance, if there is a flaw in the design that causes water to leak through, they would be able to catch it and make alterations to the design before they actually put the skin on the building. Its a lot easier to catch problems beforehand.
__________________
- George -

http://www.barackobama.com
Reply With Quote
  #27 (permalink)  
Old 03-01-2006, 01:19 PM
mattj's Avatar
mattj mattj is offline
Cheesesteak GURU! Wiz with
 
Join Date: Jun 2005
Location: ??????
Posts: 1,769
Default

It's what both of you said. A preview with a purpose.
__________________
fotographia


Reply With Quote
  #28 (permalink)  
Old 03-01-2006, 04:37 PM
pug's Avatar
pug pug is offline
Cheesesteak GURU! Wiz with
 
Join Date: Mar 2004
Posts: 2,025
Default

Comcast = Evil
Reply With Quote
  #29 (permalink)  
Old 03-01-2006, 07:40 PM
KEIKO's Avatar
KEIKO KEIKO is offline
Water Ice Vendor
 
Join Date: Jun 2005
Location: philly
Posts: 996
Default

thanks for the answers!
__________________
NO MATTER WHERE YOU GO...THERE YOU ARE
Reply With Quote
  #30 (permalink)  
Old 03-01-2006, 08:12 PM
Phanatic's Avatar
Phanatic Phanatic is offline
Tastykake Maker
 
Join Date: Nov 2005
Posts: 204
Default

They started laying the steel beems today. One of the construction guys says the first part is for the garage. The construction will get a lot more interesting now! "GO COMCAST GO!" to quote Sasso
__________________
www.phillyskyline.com

Last edited by Phanatic : 04-02-2006 at 12:37 PM.
Reply With Quote
Reply


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 07:27 AM.


Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.