View Single Post
  #263 (permalink)  
Old 05-16-2008, 02:16 AM
alesis's Avatar
alesis alesis is offline
Cheesesteak GURU! Wiz with
 
Join Date: Oct 2005
Location: Cantfeedumdontbreedum, PA
Posts: 6,919
Default

We walked between front and 3rd on south tonight and there is no new concrete cracking. There are some areas that still have old cracked concrete because the handicapped access areas still need built-but the areas that are completed are not cracked in any way.

A couple of businesses had their cable knocked out. I can believe the basement leaks due to obvious seepage from the sidewalk gaps from demoltion.

As for picts, there's not too much to see. The concrete is symmetrical, the lights are in, but there are still holes for the upcoming trees and meters, and the corners still need done. Oh, and the cellar doors still need done.
__________________
olympics rule
Reply With Quote